Triad was selected to fabricate approximately 1200 tons of pile templates for the Howard Frankland Bridge project in Tampa, FL.
The project had a very aggressive schedule and required value engineering to facilitate assembly utilizing bolted connections as opposed to field welded connections.
Triad added additional value to the project by utilizing our parent company’s (Traylor Bros.) river access terminal in Wickliffe, KY to ship the fully assembled templates to Florida via barges.